Q1
AS 9100 / ISO 9001 compliant Quality Management System (QMS) or equivalent required
Q2
ISO/IEC 17025 or National Equivalent (e.g., UKAS, COFRAC, NIST) QMS approval required for calibration or laboratory service provider
Q3
Nadcap accredited processor required
Q4
Inspection (& traceability) report required
Q5
100% characteristic accountability or equivalent required (<100% acceptance plans require prior approval by the Acra Aerospace Quality Assurance department)
Q6
First Article Inspection report required
Q7
First Article Inspection Report (AS9102 formatted) required
Q8
First Article specimen approval prior to production run required
Q9
DFAR 252.225-7014 (ALT I) “preference for domestic specialty metals” requirements apply
Q10
Unless otherwise specified, the latest document revisions apply
Q11
Certification of Conformance is required with each shipment
Q12
Test coupons required for each production run and / or lot
Q13
Test report and certification required for each production run and / or lot
Q14
All quality records shall reference the appropriate Acra Aerospace purchase order number
Q15
Certificate of Conformance shall state parts are manufactured from material supplied by Acra Aerospace and reference the applicable Acra Aerospace purchase order and heat numbers
Q16
Significant operation (requires process approval): Once approved significant operation procedures shall not be changed without prior written approval of Acra Aerospace
Q17
All special processes and testing must be performed by a GE approved source
Q18
GE Specification S-400 (Certified Material Test Laboratories) applies
Q19
GE Specification S-1000 (Quality System Requirements for suppliers) applies
Q20
GE Specification S-1001 (Source Substantiation Requirements) applies
Q21
Persons manufacturing or working on Acra Aerospace purchase orders, understand their contribution to:
Product or service conformity
Product safety
Importance of ethical behavior
Q22
Supplier / Seller shall ensure that they have a counterfeit parts prevention program in place
Q23
For materials provided by Acra (or purchased by the supplier), the supplier is responsible for verifying 100% of the material using a handheld spectrometry device or an equivalent method. Verified proof must be provided with the shipment.
If the supplier is unable to verify the material, the Acra team will visit the supplier’s facility to perform 100% material verification using a handheld spectrometry device and will stamp the material certificate before production. The supplier shall not begin production without the material being spectrometrically approved by Acra.