Q1

AS 9100 / ISO 9001 compliant Quality Management System (QMS) or equivalent required.

 

Q2

ISO/IEC 17025 or National Equivalent (e.g., UKAS, COFRAC, NIST) QMS approval required for calibration or laboratory service provider.

 

Q3

Nadcap accredited processor required.

 

Q4

Inspection (& traceability) report required.

 

Q5

100% characteristic accountability or equivalent required (<100% acceptance plans require prior approval by the Acra Aerospace Quality Assurance department).

 

Q6

First Article Inspection report required.

 

Q7

First Article Inspection report (AS9102 formatted) required.

 

Q8

First Article specimen approval prior to production run required.

 

Q9

DFAR 252.225-7014 (ALT I) “preference for domestic specialty metals” requirements apply.

 

Q10

Unless otherwise specified, the latest document revisions apply.

 

Q11

Certification of Conformance is required with each shipment.

 

Q12

Test coupons required for each production run and / or lot.

 

Q13

Test report and certification required for each production run and / or lot.

 

Q14

All quality records shall reference the appropriate Acra Aerospace purchase order number.

Q15

Certificate of Conformance shall state parts are manufactured from material supplied by Acra Aerospace and reference the applicable Acra Aerospace purchase order and heat numbers.

 

Q16

Significant operation (requires process approval): Once approved, significant operation procedures shall not be changed without prior written approval of Acra Aerospace.

 

Q17

All special processes and testing must be performed by a GE approved source.

 

Q18

GE Specification S-400 (Certified Material Test Laboratories) applies.

 

Q19

GE Specification S-1000 (Quality System Requirements for suppliers) applies.

 

Q20

GE Specification S-1001 (Source Substantiation Requirements) applies.

 

Q21

Persons manufacturing or working on Acra Aerospace purchase orders understand their contribution to:

  • Product or service conformity
  • Product safety
  • Importance of ethical behavior

 

Q22

Supplier / Seller shall ensure that they have a Counterfeit Parts Prevention Program in place.

 

Q23

For materials provided by Acra Aerospace or purchased through Acra Aerospace’s suppliers, the supplier is responsible for verifying 100% of the material using a handheld spectrometer or an equivalent method, as outlined in AS13100 Section 8.5.1.4.1. Proof of verification must accompany the shipment.

 

If the supplier cannot perform this verification, Acra Aerospace will either visit the supplier’s facility to conduct 100% material verification using a handheld spectrometer and stamp the material certificate before production, or verify the material prior to issuing it. Production must not begin without Acra Aerospace’s spectrometric approval of the material.

 

Additionally, the supplier must provide a bar end sample from each bar, rod, or plate used in production and include it with the shipment. The total number of bars, rods, or plates used as raw materials must also be documented on the supplier’s Certificate of Conformance (CofC) or a related document.

 

300067_ QA-099  Supplier Quality Requirements_ Rev. D